ABOUT US

NIP GLOBAL LOGISTICS ENCOURAGING TELECOMMUNICATION COMPANY TO DEVELOP OR BUILD NEWER SITE TO IMPROVE THE QUALITY OF NETWORK UP TO MEET CUSTOMER SATISFACTION.

VISION & MISSION

WE ARE EMERGING AS A MAJOR INSTALLER AND DOMINANT FORCE IN THE TELECOMMUNICATIONS BUSINESS, ENABLING INDIVIDUALS TO CONNECT AND INTERACT AS ACTIVE PARTICIPANTS IN THE DIGITAL WORLD WITH ENERGY, POISE AND BOLDNESS.

reference access offer

Click the image to view the file

Certificate of Contractor
Registration with CIDB

Sijil Perolehan Kerja Kerajaan
from CIDB

Registered Solar PV Investor
under SEDA

SCORE Certificate
by CIDB

what we do

THe new recognized contractor in the telecommunication industry to end to end services

project management office

- Daily Coordination -

- NFP Registration -

- BOQ / Rental Rate Negotiation -

- SAQ (Site Acquisition) -

- Local Council Submission -

- Tenancy Agreement -

- LOO / LWO -

- TNB Online Application -

- Business Development -

technical services & support

- Technical Drawing -

- Construction & Foundation -

- Poles Erection -

- TNB / Power Termination -

- Duo Bay Cabinet -

- Dismantling Existing Streetlight -

- Electrical Works -

fabrication & manufacturing

- RAW Materials -

- Poles Designing -

- Cutting & Burning Works -

- Forming, Machining & Welding -

- Galvanizing -

- Final Assembly -

- Bracket & Electrical Wiring -

- Marketing -

- Logistics -

- Installation & Delivery -

PRODUCTS & services

NIP GLOBAL LOGISTICS IS PRACTISING THE METHOD OF DETERMINING THE VALUE OF THE SERVICES BASED ON PMO (PROJECT MANAGEMENT OFFICE) AND END TO END SERVICES.

Lampole: 18m Landed structure with LED lights

Lower/Upper Service Door in between range of 14.8 m

4 units 2 meter sub-boom

Numbers of feeder cabling via innerpole up to upper service door:
1/2” – maximum to 16 runs
7/8” – maximum to 6 runs
1 5/8” – maximum to 3 runs

Plan layout – 3.0 m x 1.30 m

3 units RRU on top of the Lampole

Lampole: 30m Landed structure with LED lights

Cabling routing via cable ladder

4 units sub-boom for each Tier consists of:
3 units of 3 m sub-boom for RF Antenna
1 unit of 2m sub-boom for Tx Antenna

Numbers of feeder cabling via inner pole up to upper service door:
1/2” – maximum to 18 runs
7/8” – maximum to 12 runs
1 5/8” – maximum to 6 runs

Plan layout – 5.0 m x 1.30 m

9 RRU units on the top of Monopole

Monopole Tree: Landed structure with LED lights

Cabling routing via cable ladder

4 units sub-boom for each Tier consists of:
3 units of 3 m sub-boom for RF Antenna
1 unit of 2m sub-boom for Tx Antenna

Numbers of feeder cabling via inner pole up to upper service door:
1/2” – maximum to 18 runs
7/8” – maximum to 12 runs
1 5/8” – maximum to 6 runs

Plan layout – 3.0 m x 1.30 m

3 units RRU on top of the Lampole

Rooftop Structure

Wall-mounted, 6m Tripod, Unipole & Camouflage Solutions: Rooftop – > 4M Boom

Duo Bay Cabinet

Solutions up to 12 RRUs / Belting: T5 Cabinet – 12 RRU Units

Billboard Telecommunication Structure

Lamp poles integrated with telecommunicatios transmission system: Byfunctional Lamp Poles

our AWESOME CLIENTS

OUR MISSION AT NIP GLOBAL LOGISTICS IS PARTICIPATING AS FULL-FLEDGED PLAYER WITH ENERGY, POISE AND BOLDNESS IN THE TELECOMMUNICATION INDUSTRY.

Contact us

nip global logistics sdn bhd (202729-W)
b-1-1, block b, jalan radius 1/1b,
off jalan teknokrat 2,
radius business park, cyber 4,
63000 cyberjaya,
selangor
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.