TELECOMMUNICATION
INFRASTRUCTURE
PROVIDER

A mode of transport for your
telecommunication needs

The new recognized contractor in the telecommunication industry

NIP Global Logistics Sdn Bhd

The new recognized contractor in the telecommunication industry to end to end services.
Our mission at NIP Global Logistics is participating as full-fledged player with energy, poise and boldness in the telecommunication industry.

Untitled design-5

Project Management Office

  • Daily Coordination
  • NFP Registration
  • BOQ / Rental Rate Negotiation
  • SAQ - Site Acquisition
  • Local Council Submission
  • Tenancy Agreement
  • LOO / LWO
  • TNB Online Application
  • Business Development
  • Untitled design-3

    Technical Services & Support

  • Technical Drawing
  • Construction & Foundation
  • Poles Erection
  • TNB / Power Termination
  • Duo Bay Cabinet
  • Dismantling Existing Streetlight
  • Electrical Works
  • Untitled design-4

    Fabrication & Manufacturing

  • Raw Materials
  • Poles Designing
  • Cutting & Burning Works
  • Forming, Machining & Welding
  • Galvanizing
  • Final Assembly
  • Bracket & Electrical Wiring
  • Marketing
  • Logistics
  • Installation & Delivery
  • We are dominating
    the telco structure
    industry

    OUR MISSION

    NIP Global Logistics participating as full-fledged player with energy, poise and boldness in the telecommunication industry.

    Lampole

    Landed structure with LED lights

    • Lower/Upper Service Door in
      between range of 14.8 m
    • 4 units 2 meter sub-boom
    • Numbers of feeder cabling via innerpole up to upper service door:
      • 1/2” – maximum to 16 runs
      • 7/8” – maximum to 6 runs
      • 1 5/8” – maximum to 3 runs
    • Plan layout – 3.0 m x 1.30 m
    • 3 units RRU on top of the Lampole

    Monopole

    Landed structure with LED lights

    • Cabling routing via cable ladder
    • 4 units sub-boom for each Tier consists of:
      • 3 units of 3 m sub-boom for RF Antenna
      • 1 unit of 2m sub-boom for Tx Antenna
    • Numbers of feeder cabling via inner pole up to upper service door:
      • 1/2” – maximum to 18 runs
      • 7/8” – maximum to 12 runs
      • 1 5/8” – maximum to 6 runs
    • Plan layout – 5.0 m x 1.30 m
    • 9 RRU units on the top of Monopole

    Monopole Tree

    Landed structure with LED lights

    • Cabling routing via cable ladder
    • 4 units sub-boom for each Tier consists of:
      • 3 units of 3 m sub-boom for RF Antenna
      • 1 unit of 2m sub-boom for Tx Antenna
    • Numbers of feeder cabling via inner pole up to upper service door:
      • 1/2” – maximum to 18 runs
      • 7/8” – maximum to 12 runs
      • 1 5/8” – maximum to 6 runs
    • Plan layout – 5.0 m x 1.30 m
    • 9 RRU units on the top of Monopole

    Rooftop Structure

    Wall-mounted, 6m Tripod, Unipole & Camouflage Solutions: Rooftop – > 4M Boom

    Duo Bay Cabinet

    Solutions up to 12 RRUs / Belting: T5 Cabinet – 12 RRU Units

    Billboard Telecommunication Structure

    Lamp poles integrated with telecommunicatios transmission system: Byfunctional Lamp Poles

    Vision 2030: Smart City

    The new concept to enhance the quality of living in the cities by year 2030.

    Dewan Bandaraya Kuala Lumpur

    • CELCOM
    • MAXIS
    • DIGI

    Majlis Perbandaran Ampang Jaya

    • <>
    • 2
    • 3

    Majlis Perbandaran Klang

    • <>
    • 2
    • 3

    Majlis Perbandaran Nilai

    • <>
    • 2
    • 3

    Our Awesome Clients:

    Office Address

    NIP Global Logistics Sdn Bhd
    No. 12, Second Floor, Jalan 1/109E, Desa Business Park Taman Desa 58100 Kuala Lumpur, MALAYSIA

    Contact Info

    Phone: +603-7987 1118
    Fax: +603-7984 8118

    Emailrizalyusuf@nipgloballogistics.com

      © NIP Global Logistics Sdn Bhd. 2020 All rights reserved.